Category: VersaFlex Case Studies
Order Files by:
Default | Name | Author | Date | Hits
Files:
Created: 2014-05-03
Version: 
License: 
Size: 124.75 KB
Created: 2014-05-03
Version: 
License: 
Size: 130.58 KB
Created: 2014-05-03
Version: 
License: 
Size: 113.11 KB

The Washington State Department of Transportation replaced several of its pier clusters during an upgrade at a ferry terminal on Puget Sound. Rather than deal with the accumulation of barnacles and sea vegetation that historically accumulated on wooden and steel pilings, the DOT opted to use steel pilings coated with polyurea. 

Created: 2014-05-03
Version: 
License: 
Size: 281.94 KB

The repair of random cracks and application of a coating in a secondary containment area was a major concern at this airplane manufacturing plant. Due to the limited shutdown time and low October temperatures most conventional coating systems were ruled out.

Created: 2014-05-03
Version: 
License: 
Size: 321.96 KB
Created: 2014-05-03
Version: 
License: 
Size: 2.06 MB
Created: 2014-05-03
Version: 
License: 
Size: 315.08 KB